Callback form submitted successfully. You will recieve call soon.
In order to ensure safety and health for occupants, the government of the UK enacts strict regulations regarding building design, construction and other areas. This includes hot water, hot water heaters, and other areas related to the supply and flow of water through buildings. It is crucial that these regulations are followed at all times, as they ensure a supply of fresh, wholesome water uncontaminated with bacteria, waste and other materials
The specific regulations relating to the supply of water are known as Part G (Sanitation, Hot Water Safety, and Water Efficiency), and an approved document was published by the government in April 2010. Within the document, the regulations are broken down into six separate sections, which are as follows:
Obviously, we’re most concerned with section G3, as it deals specifically with hot water, hot water storage and other related issues. Once, G3 related strictly to unvented water storage, but the new requirements relate to all hot water systems, and there are new provisions included to prevent scalding injuries. Sections two and three of G3 are the most important.
Within section two, you’ll find enhancements to the requirement that hot water systems, expansion vessels and storage tanks are “fit for purpose “. They must be capable of withstanding the stress of temperature and pressure increases through normal use, or that might occur during a failure that can be “reasonably anticipated “.
What does reasonably anticipated mean? Really, it simply means any situation that the designer or installer of the hot water system could foresee occurring through normal usage of the system. For instance, lime scale building up within pipework would be a foreseeable potential issue. However, it is one where the only real option to remedy the system is annual draining and flushing of the system to remove the lime scale build up.
Another example could be the ongoing heating of a thermostat. Thermostats must be made from material capable of holding up in situations in which they remain at high temperatures for long durations, without degrading, breaking down or being damaged. It includes, but is not limited to concepts like normal wear and tear, temperature resistance, pressure resistance, and the like.
The third section requires that any part of a hot water system incorporating a hot water storage vessel be fitted with safety devices that prevent the water from exceeding 100 degrees centigrade. In addition, any water discharged from a heated vessel must be discharged safely and visibly.
Discharge pipework can be located on the roof of the home, or it could exit through an exterior wall. In the case of roof venting, the roofing materials used (shingles, etc.) must be rated to handle very high temperatures, as well as high pressure water flow. If this is not the case, the roof must be resurfaced, or the pipework will need to be rerouted so that it exits through an exterior wall at or near ground level.
Note that in all instances, the discharged water must be contained and protected. This is generally accomplished by the use of metal grids, specially designed outflow shields, and other methods.
Most vented hot water heaters contain at least three safety systems, and the tundish provides visibility for discharged water. This section also quires that all hot water systems are installed and maintained in accordance with manufacturer instructions. This goes hand in hand with the recommendation from manufacturers that hot water heaters be professionally serviced at least once per year.
The actual wording from the document regarding sections two and three can be found below:
(2) A hot water system, including any cistern or other vessel that supplies water to or receives expansion water from a hot water system, shall be designed, constructed and installed so as to resist the effects of temperature and pressure that may occur either in normal use or in the event of such malfunctions as may reasonably be anticipated, and must be adequately supported.
(3) A hot water system that has a hot water storage vessel shall incorporate precautions to:(a) prevent the temperature of the water stored in the vessel at any time exceeding 100c; and (b) ensure that any discharge from safety devices is safely conveyed to where it is visible but will not cause a danger to persons in or about the building.
If you need assistance with any hot water heater repairs, to schedule hot water heater maintenance, or to install a new hot water heater, call EasyFlow at 0800 433 4043
While the G3 building regulations documentation provides a great deal of guidance and assistance for homeowners, builders, installers and others who will work with hot water supplies and both vented and unvented hot water heaters, many questions can arise. Below, we’ve included some of the more commonly asked questions, as well as the answers you require.
Any washbasin or bidet, shower, sink or other fixture must be supplied with “wholesome” water or softened water. All types of hot water systems must properly support cold water cisterns that supply or receive water from hot water cisterns. All new homes and modified homes must have temperature regulation equipment that maintains heated water at no more than 48 degrees centigrade in the bath. This is usually achieved by using a thermostatic mixing value.
Yes, they do. In fact, the revised G3 building regulations apply to all hot water systems, no matter how large or small they might be. However, with smaller systems, such as those that have a capacity of 15 litres or less, there is no need for certification unless electrical work is also required to comply with Part P.
While the G3 building regulations state that polybutane or polyethylene should be used, polypropylene can also be used in the design and construction of discharge pipework for unvented hot water systems, so long as the overall design still complies with the requirements set forth in the overall G3 building regulations document.
The most important consideration is that the material used to construct the pipework be able to handle the high temperature water in the system. As such, metal piping is acceptable, including cast iron. However, other materials can also be used, including polypropylene, polyethylene and polybutane, to name only a few. Note that some materials, such as PVCu stacks, are only usable in domestic hot water systems and cannot be used with combi boilers.
At EasyFlow, we understand the requirements set forth in the UK’s G3 building regulations, and how those regulations apply to both new home design and construction, as well as both remodelling existing homes and changing use of properties. Our expert installers and service professionals can ensure a constant supply of hot water, while guaranteeing that all unvented hot water heaters, discharge pipework and other elements are in compliance with UK regulations.
Our maintenance plans are designed to ensure our customers enjoy peace of mind, and constant hot water. We keep your hot water flowing while minimising your costs and eliminating stress. Let our experts identify and correct water heater faults, while you enjoy low monthly payments.
Thank you very much for the quick and excellent service
Colin, Liverpool
12th July, 2022
Replacement Valves
Just a word of thanks for the emergency support and repair carried out this week. Once again the work was carried out expertly, without leaving any mess and with great courtesy. Well done and thanks again for the support in our hour of need, much appreciated. Regards
BRH, Manchester
10th January, 2022
No Hot Water
Really appreciated the immediate answer when I phoned on Tuesday, which was a Public Holiday, about a significant leak in our pressurised hot water system. Really appreciated the quick call back to discuss the emergency situation and for the repair carried out by him on Tuesday this week. Once again the work was carried out expertly, without leaving any mess and with great courtesy. An excellent service. Well done and thanks again for the excellent support in our hour of need; much appreciated.
Brian, Styal Road Wilmslow
28th December, 2021
Maintenance Plan
After a few years of struggling to get adequate hot water our landlord finally brought in the right people for the job. Chris our engineer was superb, after a brief chat with myself he diagnosed & repaired the issue in under two hours. Excellent service & very professional. Thanks to you we now have plenty of hot water 24/7.
Chris Sheridan, Manchester
23th March, 2021
Blending Valve Replacement
After having a bad experience with a Company pretending to be local who pretty much ripped me off, I was glad to find Easy Flow were local and the service from start to finish was excellent. Got a call back within ten minutes and was promised someone would be round to review that evening and then complete the job a couple of days later if needed. Chris, who attended texted me to give me an ETA and arrived when promised, masked up and Covid friendly. Really nice guy who told me the problem and was looking at his diary and decided to stay and complete the job then, so stayed on a Friday evening for almost two hours, leaving at 7.30, ensuring the job was done... Could not recommend highly enough...
Terry Garnett , Salford
15th January, 2021
No Hot Water
Very efficient and thorough - thanks again.
Danny Benson, Castlefield
10th August, 2020
Annual Service
EasyFlow installed a new thermal store water heater in our flat in Manchester city centre. Throughout the whole process, from the initial inspection, the quick turnaround in providing a quote through to full installation, we were extremely pleased with the service provided and would highly recommend to anyone in need of a heating specialist.
Matt and Alice, Manchester, UK
17th May, 2020
Installation
Engineer was prompt, very thorough, I had asked for service and repair. This was done swiftly and his knowledge of the product instilled confidence in his work. Quick, clean and good job well done. I shall be booking an annual service next year.
Beverley Venyige , West Yorkshire
30th March, 2020
Annual Service